Monday, 30 January 2012
Shovster Build Update
Messing with the details this week. Got the clutch parts from Andy at AHCC and were off running. Last big hurdle is making the engine sproket.
Plug the Hole!
1. Highlighted with a pencil is a hole in some steel strip we dont want
2. Clamp the strip to some heavy gage aluminium and weld it up
3. The back side of the strip, the aluminium has stopped the weld level with the surface but looks rough. weld this side aswel
4. Grind to a nice level surface. Looks sweet! well done!!
SUCK IT
Wednesday, 25 January 2012
Monday, 23 January 2012
Shovster update
The Shovster is going to be done in two stages
1. mock up, throw together and check it works ok. Change things that need changing
2. Strip and finish. This will include new tank bars, pipes etc. Full paint job and chrome.
Ride Safe
Dr Al
Wednesday, 18 January 2012
Tuesday, 10 January 2012
Skeleton Chop Shop Update
The shop is very busy with bike builds
There is a new tshirt design out soon!
The stock is slowly getting back to normal
The new year fuzz is fading
Waiting for spring
Tomorrow could be overweight....
Tuesday, 3 January 2012
Subscribe to:
Posts (Atom)